News

Gravity Look Ahead – Q1 2026
Delivery partners will build on 2025 momentum in 2026, with major milestones including Building One works, the VES, and NGET infrastructure.

Gravity Programme Director to join panel at The Business of the South West Conference 2026
Paul Lowndes has been invited to speak at The Business of the South West Conference 2026, joining the “Major projects delivering on strategic promises” panel.

Gravity to host VES residents briefing
Join representatives from This is Gravity Ltd, Gleeds, and Stantec as they present details of the Village Enhancement Scheme (VES),…

New footage shows impressive progress at Agratas’ Somerset battery facility
Gravity’s primary site occupier, Agratas, has shared dramatic aerial footage capturing construction progress.

Gravity Look Ahead – Q4 2025
A look ahead to Q4 2025 at Gravity: key construction milestones, infrastructure updates, and community improvements shaping Gravity.

Air monitoring equipment to be installed across Puriton and Woolavington
Stantec on behalf of This is Gravity and Agratas have coordinated the installation of a network of air quality sensors across Puriton and Woolavington.
Gravity Project Documents
- Gravity LDO - Parameter Plans
- Gravity LDO: Environmental Statement Non-Technical Summary
- Environmental Statement Vol 1 Main-Text
- Environmental Statement Vol 2 Appendix 1
- Environmental Statement Vol 2 Appendix 2
- Environmental Statement Vol 2 Appendix 3
- Environmental Statement Vol 2 Appendix 4
- Environmental Statement Vol 2 Appendix 5
- Environmental Statement Vol 2 Appendix 7
- Environmental Statement Vol 2 Appendix 8
- Environmental Statement Vol 2 Appendix 9.1
- Environmental Statement Vol 2 Appendix 9.2
- Environmental Statement Vol 2 Appendix 9.3
- Environmental Statement Vol 2 Appendix 9.4
- Environmental Statement Vol 2 Appendix 10
- Environmental Statement Vol 2 Appendix 11
- Environmental Statement Vol 2 Appendix 12.1
- Environmental Statement Vol 2 Appendix 12.2
- Environmental Statement Vol 2 Appendix 13
- Environmental Statement Vol 2 Appendix 14.1
- Environmental Statement Vol 2 Appendix 14.2
- Environmental Statement Vol 2 Appendix 14.3
- Environmental Statement Vol 2 Appendix 14.4
- Environmental Statement Vol 2 Appendix 14.5
- Environmental Statement Vol 2 Appendix 14.6
- Environmental Statement Vol 2 Appendix 15
- Environmental Statement Vol 2 Appendix 16
This consent enables Gravity to begin immediate implementation and earthworks.Â
*Please be advised that this section of downloadable documents contains zip folders of sizes up to 50MB
- Click here to view Planning Decision Notice.
- Click here to view the online suite of planning documents.
This is Gravity are expecting to initiate the works to deliver the Village Enhancement Scheme (VES) in Q4 2025. Physical works will commence in Q1, 2026. Completion of these works will see Puriton and Woolavington connected by a pedestrian/cycle path, as well as traffic calming measures introduced in both villages.
Downloads
- Click here to download the general Gravity brochure.
- Click here to download the Gravity LDO brochure.
- Click here to download the general Gravity Brochure in Mandarin
In anticipation of COP 26, Gravity led the production of the 'Green Recovery Report' which sought to identify and recommend the actions required to lead Britain into a net-zero future. Contributors included utility giant E.ON, University of West England, University of Bristol and maritime decarbonisation company Artemis Technologies.Â
Â
Click here to read the eight simple steps that were synthesized from Gravity's Green Recovery round table discussion.Â